Touring Frame Stock Replacement (09+)

$1,800.00 - $2,500.00
Write a Review
Shipping:
Calculated at Checkout

CDC has been building frames since 2004 and have recently retooled our frame fixtures to produce more precise and consistent frame builds. Utilizing multiple point fixturing, laser leveling, and manufacturing new components to engineering drawings ensure a quality frame build. All tubing is manufactured from seamless, 'drawn over mandrel (DOM)', tubing. Welding is done with Miller welding machines by experienced welders.


• Comes with a 17 digit VIN / SN# and MSO for registration 
• All stock parts guaranteed to bolt on 
• Includes pressed in neck races and bearings

• This frame is currently built to order with a leadtime of 3-4 weeks


CDC's new construction consists of CNC parts designed, engineering, and manufactured in house, as well as all fabrication done in our shop with some locally outsourced laser cutting. Gloss black powdercoating is included with new construction frames.

CDC's remanufacturing process has a 15 point pre-inspection QC of all core frames and utilizes the same front end components as our new construction frames sleeved to the OE frame for a strong and durable joint. Unfortunately, powdercoating is not available for remanufactured frames at this time.